Uh. When did you order?
I'm still waiting for a Spectre with engravings from July. I was told on October 6th that they expected some 5-7weeks from there. So right about now. Or last week even. But no news about my order.
I didn't order them all together. But the blue Spectre late last month, Nov.
With V3 and V4 chips. So, from top to bottom:
1.) Guardian blue Spectre with etchings, Angled shaped control box with Blue power switch and Dorinian pommel. Cut outs on the emitter.
Ultraedge mid-grade, thin walled blade.
2.) Consular green Spectre w/o etchings. Angle shaped control switch with green illumination and Dorinian pommel. Cut outs on the emitter.
Ultraedge mid-grade, thin walled blade.
3.) Blazing red Spectre with etchings. Square shape for the red illuminated power control switch. Dorinian pommel with Standard emitter.
Ultraedge mid-grade, thin walled blade.
4.) Guardian blue Fallen with Spectre emitter with cut outs. Blue LED activation button and Dorinian pommel.
Thick walled dueling blade.
5.) Blazing red Savior with standard Spectre emitter. Silver activation button with no leds. Dorinian pommel.
Thick walled dueling blade.